HARARE – The Zimbabwe Electricity Transmission and Distribution Company (ZETDC) has attributed on-going power shortages to depressed electricity generation owing to dwindling dam water levels at Kariba dam. In a statement, the power utility also blamed the crisis on ongoing maintenance work at Hwange Unit 8. ZETDC said the national grid is generally depressed owing to the challenges.